Location
Gawler
Scope
Formwork
Sector
Civil Construction
Status
Completed
── THE PROJECT
Gawler River Bridge over the South Para River provide important link to Gawler East.
F17 Formwork partnered with Bardavcol to construct a new bridge over the South Para River as part of a $67 million project. F17’s $2.2 million package covered formwork, steel fixing and concrete placement for four piers, two crossheads, two abutments, the bridge deck and two approach slabs.